Building Dragonflight
(Motueka)

 

Picture
In the year 2000 the bird garden at 'Dracoweyr' was a collection of knocked together flights & aviaries. Most of them had been built with dirt floors so of course mice quickly moved in and made themselves quite at home. A number of them were second hand as finances didn't stretch far in those days.

The kitset metal aviaries I soon found to be too hard to work in, with the low doorways making some painful impacts to the head! They were also too cold in the winters and sometimes too hot during the summer. None of them included safety cages so these had to be added when they were assembled.

All were far too small, one even being too low for me to stand up in! I dreamt of having aviaries that were nice for the birds to live in as well as being easy for me to work in.

The end of 2004 saw work start on the Birdroom and we seem to have been building every summer since then.

What follows is 'Dragonflight' being built.


  December 2004
Picture
1. The plan is finally pegged out.
Picture
3. The timber arrives.
Picture
5. Each wall is built in panels then erected on the concrete pad.
Picture
7.
Picture
9. The roof is ready to go on.
Picture
11.
Picture
13. Doors to the planned flights.
Picture
15. .... then the walls are lined.
 
Picture
2. Concrete is laid.
Picture
4. Building begins.
Picture
6.

Picture
8. Ready for the roof.
Picture
10. 4 walls and a roof, a birdroom!
Picture
12. The painting starts.
Picture
14. The wiring goes in ......
Picture
16.
Picture
17. The lights work!
May 2005.

The Birdroom is finished and we stop building before winter.

December 2005.

Building starts again over summer.
Picture
18. The first flight is measured out.
Picture
20. The first wall goes up.....
Picture
22. Three walls and a roof =
Picture
24. The second flight is started.
Picture
19. Concrete for one and a half flights is poured.
Picture
21. ....& the second one.
Picture
23. a finished flight.
Picture
25.
Picture
26. And then there were 2!



March 2006


Picture
27. One more flight and the porch still to build.
Picture
29. The last two flights are started in the new year of 2007.
Picture
28. The porch is finished by the end of 2006.
Picture
30. These two have a connecting door between them & are half the width of the first two flights.
(Doesn't Dino look extremely well behaved and intelligent? I never realised he was such a good liar!)
Picture
31. Waiting to be painted...... the weather didn't help!
Picture
Finally finished!
Picture
February 2007